top of page
IMG_7460.heic

10 Day Kitchens

Eager to enjoy a brand-new kitchen without the long wait? Don’t hesitate! Contact the remodeling experts at Arcis Kitchen & Bath today and ask about our fast-track kitchen solutions. Let’s begin your kitchen transformation journey in South River, NJ, and all surrounding areas!

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram

REMOVAL & REPLACEMENT
Our 10-day kitchen program is a great option for homeowners who aren’t planning to move walls or change the footprint of their kitchens. A 10-day kitchen remodel can include a direct removal and replacement of the following:

        Cabinets​

        Countertops

        Faucets & Sinks

        Backsplash Tile

Countertop symbol

FAQs on Arcis Kitchen & Bath’s 10-Day Kitchen Remodels

What exactly is a 10-day kitchen remodel by Arcis Kitchen & Bath?

  • Our 10-day remodel is a highly streamlined process focused on efficiency and precision. We complete all essential updates to refresh and transform your kitchen within 10 days from the start of demolition.

What can I expect from a 10-day kitchen remodel?

  • You can expect a full cosmetic upgrade—cabinet refacing or replacement options, new countertops, updated fixtures, backsplash, flooring, and more. We elevate both the look and functionality of your kitchen in a fraction of the usual time.

How is Arcis Kitchen & Bath able to complete a remodel in just 10 days?

  • Through detailed pre-planning, a dedicated installation team, and well-coordinated processes, we streamline every step. All materials are ordered and confirmed before project start, allowing us to deliver a fast yet high-quality renovation.

Will the quality of work be compromised due to the fast timeline?

  • Not at all. Speed never comes at the expense of craftsmanship. Our efficient workflows and experienced installers ensure the same high-quality finish you’d expect from a traditional remodel—just faster.

Are there limitations on what can be done in a 10-day remodel?

  • A 10-day remodel is not a downgrade in quality. We use the same high-end products and finishes. The reason the timeline is short is because we avoid major construction—no moving walls, plumbing lines, or electrical layouts.

  • Structural changes or full redesigns require more time and city inspections, which extend the schedule.

What steps should I take to prepare for a 10-day remodel?

To keep the process smooth:

  • Clear out the kitchen and surrounding areas

  • Arrange temporary meal options

  • Finalize all design decisions, materials, and approvals before the start date

The more prepared you are, the more seamless the remodel.

Are permits required for a 10-day kitchen remodel with Arcis Kitchen & Bath?

  • Permits depend on the scope of work. Cosmetic “remove-and-replace” remodels may not require permits, but anything involving plumbing, electrical, or structural changes will. If needed, our team handles the entire permit process.

Can I make design changes during the 10-day remodel?

  • We strongly recommend finalizing all design decisions beforehand. Changes during installation may delay the project and extend it beyond the 10-day window. The design phase is critical to maintaining the schedule.

What happens if unexpected issues arise during the remodel?

  • Our experienced team is trained to handle surprises quickly and efficiently. We address any issues with minimal impact to the timeline whenever possible.

How do I get started with Arcis Kitchen & Bath for a 10-day remodel?

  • Contact us for a free consultation! We'll review your goals, evaluate your space, and guide you through the process to achieve a beautifully transformed kitchen in just 10 days.

bottom of page